PDN Building, Moi Univerity

The project involved the completion of the stalled PDN Building at the Moi Teaching and Referral Hospital, Eldoret Town. Initially designed to have five floors, the building stalled at the 4th floor due to concerns on the structural integrity of the building, occasioned by cracks along masonry/concrete beam joints, honeycombing and sagging long beams (12.0m) A comprehensive structural audit and integrity assessment was undertaken that recommended remedial works involving demolition of a portion of the 4th floor slab that had been laid, column jacketing, beam strengthening and waterproofing of leaking areas and extending the construction to five floors as originally designed.