Kibada Satellite project was on a sprawling 215 acres of land, the development had been proposed by the National Housing Corporation (NHC) of Tanzania. It had a comprehensive scope of works ranging from mapping the baseline conditions of existing infrastructure to predicting future utilization patterns post-implementation. The satellite city’s blueprint not only addressed immediate needs but also served as a forward-thinking guide; predicting and accommodating future demands on infrastructure capacity, forming a basis for detailed infrastructure design of roads, drainage, water, wastewater management and solid waste management. The area had terrain that sparked the need for strategically placed sewer drop manholes and proper road alignments.
